{
  "completed_step": "C397",
  "next_proposed_step": "C398",
  "question": "Test whether the complete E/P/J loops transport through the already recorded+215 branch translation to the original full43017K configurations. Solve the unique translated E pivot and verify source and phase availability without fitting an anchor.",
  "reason_selected_after_current_result": "The positive circuit structure is located on the lower-full430 common P/J branch. The original Mirror/529 question requires determining whether the entire structure reaches the original17K branch.",
  "executed": false,
  "authorization_remaining": 6,
  "fixed_scope": "Mirror/529; regular Gears Noah/Shem/Flood only; SP companion local. Fixed source inputs, no canonical/graph changes."
}
