# Sixth handoff — continue from C479 Read 490d_Sixth_Handoff_C479_20260925.md first, then the reading guide, archive verification, correction ledger and report/evidence locator. C479 is complete. C480 has not been executed. This handoff performs no new research. The compact kit is the active packet. Its complete latest packets are under active/C470 through active/C479; immediate C480 inputs are already frozen in C470. The full archive is a selective reference library: packets/C266 through packets/C479, plus intact C01–C265 and September17 archives under reference/. Use the locator to distinguish outer containers from inner member paths. All479 reports/results are located. Original unprefixed reports and Engine reports remain separate. Verify actual access to File_18, File_09 and the C479 checkpoint; return a brief access/status summary and small restart checkpoint, then wait for Dean's instruction unless he has already authorized research. The next bounded question is the existing1150 source grammar, not the superseded original C266 AD1905–1911 proposal. Keep Mirror/529 focus and regular Gears Noah/Shem/Flood only. Current scope and corrections override all historical next-step paragraphs. The September17 original is intact. No civil yearzero, imported person companions, new dates/pivots/phases/global axes, cumulative Gears or primer reopening follows from this packet. Run python3 verify_handoff_package.py ARCHIVE.zip for artifact verification only. Use a selected packet README for any separately authorized research replay. Do not run old upload/orchestration scripts.