Research action

Cumulative counterpart of the600 endpoint repairs

Download source fileOpen in research workspace

Study sequence: Anchored harmonic ladders, 598→600 repairs and paired P/J (C334–C373) · Mirror & 529

490d C351 — Cumulative counterpart of the600 endpoint repairs

24 September 2026. Step 8 of 10 in the C344–C353 authorization.

All four complete cumulative paths admit460+598→458+600 while keeping1058 fixed. The two primary regular counterparts admit the same partition change, with both17K outer comparisons unchanged.

Let S be native-ON cumulative Shem at i+2, P the OFF-Shem member at i+2, and q the OFF-Flood member at i. Their retained dissection is P−S=460, q−P=598.

Cumulative repairExisting replacementNew partitionOuter span
Hold q; enlarge598 to600P moves to OFF-Shem at i458+6001058
Hold P; enlarge598 to600q moves to OFF-Flood at i+2460+6001060

The replacements exist for i2,i3,i4,i5, with both inherited matching components. No cumulative Gear is assigned. The458 leg compares different Cainan states and different annual indices; same-index Cainan insertion remains460.

On the regular primary side, holding R and selecting the next-Gear MT Noah similarly gives N−M_new=458 and M_new−R=600. At i3/i5, both sides can therefore use458+600 while all four original outer endpoints remain fixed. Their2K sides and17K cross-spans are untouched. The altered interior is not a new independent529 relation.

The cumulative construction also works at the two companion indices; the regular300/299 counterpart does not, because its input is599. That asymmetry remains explicit.

The original cumulative460+598 dissection was already retained, including C90. This step adds the source-member repair comparison. It does not assert that File_02 prescribes applying both repairs together. The final research control is whether requiring598 on both sides supplies a new selector, or simply restates the conditions already imposed on the2K structure.

Verification and limits

30 main checks and 18 frozen-input/predecessor authentication checks passed. A second main replay produced byte-identical DATA/RESULTS. These checks and the source interpretation were performed by the root agent; no new independent-agent review is claimed. All frozen originals and standing controls remain unchanged. Verification counts are not independent-witness counts.

Same retained annual and Gear domains; no new cumulative Gear, lifespan, phase, anchor or prescribed joint operator.

Mirror/529 focus: K=529, E=25/23, P=70/69. Global paired Mirror January AD1; local junction January AD2; no civil year zero. Regular Gears are Noah/Shem/Flood only. SP minus-one person companions remain local to SP Noah/Shem; Flood close is a separate boundary. No upstream/cumulative Gear, new endpoint or phase, fitted anchor, global axis, primer reopening, canonical or graph edit. Capture now; canonize later. Source identity, context, modal binding, generated coordinates and phase ancestry stay distinct.

Decision after this result

C352, proposed and unexecuted: Test the paired598-input requirement in C319’s fixed a,b menu and identify its exact dependency on the existing2K conditions. Recheck File02’s regular-gap and cumulative-propagation permissions before assigning any coupled source-rule status.

The paired600 partitions are now source-qualified numerically. The last unresolved research issue is whether this pairing establishes more than conditional selection from the already chosen input gaps.

Linked sources and evidence

Edition and provenance

490d_C351_Cumulative_Counterpart_of_600_Repairs_20260924.md

SHA-256 03562643079e8e92cfeb8ade14ae6b0c044c72e09a459f8f89239f93f6601f73

C01–C479/packets/C351/490d_C351_Cumulative_Counterpart_of_600_Repairs_20260924.md